Design & Planning
Loft Conversion Design Packages
Buy design. Decide to build later.
Five architect-led packages from £495 + VAT. Buy one step at a time — feasibility, drawings, planning or building regulations — or hand over the whole design process in one Complete package. No obligation to build.
The five packages
All prices exclude VAT.
- From £495
- Starting price excl. VAT — feasibility & concept check
- 5 packages
- Buy one step at a time or the complete design journey
- No lock-in
- Design packages carry no obligation to build with LINX
- In-house
- Architects and structural engineers under one roof
Which package do you actually need?
Five packages can look like a lot of choice. Answer two questions and we will point you to the right starting point — and explain why the others do not apply.
Where are you in the project?
Your suggestion appears here
Answer one or two quick questions and we will point you to the package that fits.
Exactly what each package includes
Every deliverable, package by package. The permitted development and planning packages are alternative routes — you would only ever need one.
| Tap a package to highlight it | |||||
|---|---|---|---|---|---|
| Is it possible | |||||
| Preliminary feasibility assessment | Included | Not included | Not included | Not included | Included |
| Indicative layout sketch | Included | Not included | Not included | Not included | Included |
| Viability report | Included | Not included | Not included | Not included | Included |
| Design and approval | |||||
| Full measured survey | Not included | Included | Included | Not included | Included |
| Proposed architectural drawings | Not included | Included | Included | Not included | Included |
| Permitted development assessment and LDC application | Not included | Included | Not included | Not included | Included |
| Planning application and submission | Not included | Not included | Included | Not included | Included |
| Design consultation | Not included | Not included | Included | Not included | Included |
| Ready to build | |||||
| Building regulations drawings | Not included | Not included | Not included | Included | Included |
| Structural calculations | Not included | Not included | Not included | Included | Included |
| Steelwork design | Not included | Not included | Not included | Included | Included |
| Building control coordination | Not included | Not included | Not included | Included | Included |
| Support | |||||
| Construction quotation | Optional | Optional | Optional | Optional | Included |
| Single point of contact | Not included | Not included | Not included | Not included | Included |
All prices exclude VAT. Optional means a construction quotation can be added to that package.
Ask which package suits youIs the Complete package worth it?
It depends on your route. Pick yours and see the two options at list prices, with nothing hidden.
Your route
Complete package compared with buying separately
Save £490
The bundle costs less than the same steps bought one by one, and it also adds a full construction quotation and a single point of contact.
One by one
£4,485
Complete package
£3,995
- Feasibility & Concept£495
- Drawings & Permitted Development£1,495
- Building Regulations & Structural£2,495
Prices exclude VAT. Only one approval route is needed, so the comparison uses the one you choose.
From survey to a build-ready design
Whichever package you start with, the work follows the same four stages. Each package covers a different part of the sequence.
01
Survey
A full measured survey of your house. Every approval and structural calculation depends on dimensions being right — estimates introduce risk; the survey removes it.
Packages 2, 3 & 5
02
Design
Layout options and a design consultation. Where the staircase lands, how the rooms divide, what the dormer will look like from the street and garden.
Packages 1, 3 & 5
03
Approve
A Lawful Development Certificate for permitted development, or a full planning application. We manage preparation, submission, and council correspondence.
Packages 2, 3 & 5
04
Document
Building regulations drawings, structural calculations, and steelwork design — the technical pack that building control checks before work starts and signs off at completion.
Packages 4 & 5
The detail behind each step
Before you choose a package
Not sure where your house fits? Tell us your address and what you have in mind — we will tell you which route applies.
Ask a design specialistDo I have to build with LINX if I buy a design package?
No. The packages are sold as design services in their own right, so you are not committing to a build by buying one. Every package also includes the option of a construction quotation, which you can take up whenever you are ready.
What is the difference between the £1,495 and £1,995 packages?
They are two different routes to the same place. The £1,495 package is for houses where the conversion fits within permitted development, so we apply for a Lawful Development Certificate. The £1,995 package is for homes that need a full planning application, such as flats, conservation areas and mansards. You only need one of them, and the finder above shows which.
Can I buy the packages one at a time?
Yes. They are stepped so that each one stands on its own and leads naturally to the next. Many people start with the feasibility package, then buy drawings once they know the route, then the technical package when approval is in place. The Complete package bundles all of it for people who would rather deal with it once.
Do I need a Lawful Development Certificate?
It is not a legal requirement, but it is strongly worth having. It is the council’s written confirmation that your conversion falls within permitted development, and when you sell, your buyer’s solicitor will usually ask for it. It is part of the £1,495 package.
Why are building regulations drawings a separate package?
Planning and building regulations answer different questions. Planning is about how the conversion looks and how it affects neighbours. Building regulations are about how it is built: the structure, fire escape, insulation and staircase. They are separate approvals with separate drawings, so they are priced as separate steps.
How long do approvals take?
As a guide, allow 4 to 8 weeks for planning and approvals before a build can start. The exact time depends on your council and the route, and we tell you what to expect once we know which one applies to your house.
Are the prices shown inclusive of VAT?
No. All design package prices are shown excluding VAT, which is added at 20%.
Get Started Today
Check Your Property & Get Your Loft Conversion Quote
Use our free property checker or speak directly with our team. We respond to all enquiries within one working day.